Superb logistics facility of approx. 98,364 sq. ft. (9,138.3 sq. m.) with high profile frontage onto the M50.
Building 1 M50 Logistics Hub is an extensively refurbished logistics and office facility strategically located in Dublin’s prime logistics' hub. Building 1 comprises approx. 98,364 sq. ft. (9,138.3 sq. m.) including approx. 12,327 sq. ft. (1,702.6 sq. m.) of office spaces. Building 1 features 18 dock levellers plus 4 grade level roller shutter doors, 15m clear internal height and a secure yard with depths up to 54m. Racking system available if required with over 7,500 pallet positions.
Targeted BER B1/B2