Site Search:
The park will consist of two modern industrial halls, each totalling 21,900 sq m. Construction of both buildings is planned. Both buildings have been designed with a clear internal height of 11.5 m. The new buildings may be ready for handover within 6-9 months after the signature of a future lease agreement.