New Development On Castillejos Street – Just A Few Steps From The Sagrada F, Sagrada Familia, Barcelona | New homes for sale | Savills
57.97 to 107.02 sq m
Guide price €525,000 -​ €675,000(CHF 479’405 -​ CHF 616’378)

New Development On Castillejos Street – Just A Few Steps From The Sagrada FSagrada Familia, Barcelona

  • New development

Translated From Spanish

Key features

  • Prime Baix Guinardó location near the Sagrada Família.
  • 2–3 bedroom homes ranging from 58–107 m².
  • Contemporary, bright and functional design.
  • Duplex units, terrace flats and varied typologies.
  • High-quality finishes and fully equipped kitchens.
  • Communal chill-out terrace and delivery in 2026.

New-build development in Baix Guinardó offering 2–3 bedroom homes with contemporary design, quality finishes, terraces, duplex options and communal areas. Completion scheduled for late 2026.

About this property

  • We present an exclusive new-build residential development located in one of Barcelona's most privileged areas: Baix Guinardó, a peaceful and well-connected neighbourhood just minutes from the iconic Sagrada Família. An environment that blends tradition, modernity and urban convenience—ideal both for living and investing.

    The development offers 2- and 3-bedroom homes ranging from 58 m² to 107 m², designed to provide maximum comfort and optimal use of space. Bright interiors, functional layouts and a contemporary style create warm, elegant homes of outstanding quality.

    There are various typologies, including two duplexes, flats with terraces, exterior units and properties on different floors. High-quality finishes and modern design throughout. Homes are delivered with a fully equipped kitchen ready to use, air conditioning and heating for year-round comfort, fitted wardrobes, parquet flooring, and window fittings designed to enhance efficiency and wellbeing.

    In addition, the building will feature a pleasant communal area with a chill-out terrace and privileged views.

    Completion and delivery of the project are scheduled for the end of the last quarter of 2026.