- Logistics Park in a new industrial development in San Fernando de Henares (Madrid)
- Building with docks on one side.
- Optimization of natural lighting.
- Precast concrete structure.
- Weft between pillars of 24.5 m.
- Sprinkler ESFR NFPA.
- RF 240 walls.
- Access with hydraulic loading docks.
- Maneuvering areas of 35 m. with berthing area in concrete of 18 m.
- Overloading of 5 t/sqm.
- Free height of 11 m.
- LED lighting system in warehouse and offices.
- Security service and fenced area.
Floor | Module | Use | Space | Height | Availability |
---|---|---|---|---|---|
Módulo 4 | Industrial | 5.979,36 | 12.0 | Immediate |