Logistics warehouse under construction, with excellent corporate image and perfect finishes.
- Concrete cover.
- Sandwich cover.
- 26 loading bays (6 docks in modules 1/2, 7 docks in modules 3/4)
- 4 TIR doors.
- Overload 5Tn/sqm.
- Prepared for medium risk 5.
- BREEAM very good.
- Fully equipped offices with all facilities.
Floor | Module | Use | Space | Height | Availability |
---|---|---|---|---|---|
Módulo 3 | Warehouse | 5.056,50 | 11.3 | Immediate | |
Módulo 3 | Offices | 117,70 | 3.0 | Immediate | |
Módulo 4 | Warehouse | 5.283,83 | 11.3 | Immediate | |
Módulo 4 | Offices | 90,00 | 3.0 | Immediate |