Düsseldorf-Seestern | attractive office space | commission-free
- workstation compatible lighting
- flooring: according to the tenant's requirements
- raised and cavity floor
- cabling available
- intercom system
- flexible partitioning
- basement Garage
- elevator
- terrace
- top load cooling (system)
- representative entrance area
- electric sun protection outside
- floor-to-ceiling windows
An energy performance certificate according to EnEV exists.
Date of issue: 05.08.2020
Date of Expiry: 04.08.2030
Year of construction: 1998
Type of energy performance certificate: Requirement certificate
Significant energy sources: CHP, renewable, District heating
Final energy electricity: 30,00 kWh/(m²*a)
Final energy heat: 104,80 kWh/(m²*a)