Leomax, a top building in Munichs City
- heating/cooling ceilings or -floors with single-room control
- electrically external sun-protection
- electrically glare protection
- cable system via cavity floor*
- suspended workstation compatible lights (direct/ indirect) with solar sensor and BUS-System
- ceiling-high windows (partially openable)
- supporting ventilation
- partially glass walls
- glass swords
- two elevators
* the availbable cable has to be checked.
An energy performance certificate according to EnEV exists.
Date of issue: 31.01.2020
Date of Expiry: 20.01.2030
Year of construction: 2002
Type of energy performance certificate: Requirement certificate
Significant energy sources: CHP, fossil, District heating
Power consumption: 143,90 kWh/(m²*a)
Consumption heat: 66,90 kWh/(m²*a)