Modern and representative, offices in Munich Dornach
- CAT7-cabeling about cavity floor*
- fibre-optic connection
- video surveillance in the entrance
- complex designed outdoor facilities
- generous entrance areas
- floor plan by tenant desire
- complete air conditioning in the attic floor
- electrically external sun protection
- IT-rooms in the Basement
- full equipped tea kitchen
- cafeteria in the neighbouring building available
- elevator
- load capacity ca. 250 kg/m²
- ensured acces to the building with a truck: 7,5 t
* the available cabeling (CAT7) has to be checked
An energy performance certificate according to EnEV exists.
Date of issue: 27.05.2020
Date of Expiry: 26.05.2030
Year of construction: 2001
Type of energy performance certificate: Requirement certificate
Significant energy sources: Gas
Power consumption: 43,10 kWh/(m²*a)
Consumption heat: 124,70 kWh/(m²*a)