Two bedroom apartment set on the 13th floor in The Silk District, a new development near to the City.
Please note that all photographs used are CGI's or those of the marketing suite. The estimated completion date Q4 2023/Q1 2024
Internal specification includes:
Siemens and Bosch premium appliances
Natural Oak effect kitchen cabinets
Black tiled porcelain splashback with white and gold
marbling
In-built wardrobes to master wit h LED lighting
Brushed gold finishes to bathrooms
and shower rooms
Bespoke, mirrored cabinet with black trim to
bathrooms and shower rooms
Comfort Cooling to the living room and master
bedroom for homes on levels 21 and above
Large format Terrazzo-effect porcelain tiles
Range of balconies and/or terraces as outdoor space
View payable Stamp Duty for this property
Your last chance to secure an immaculately designed two bedroom apartment in the new development 'The Silk District', moments from the City!
Chloe Luxon