Hotel Units In Exclusive Complex, Kolasin, Montenegro, R2110-3 | New homes for sale | Savills
25.50 sq m
Guide price €127,226

Hotel Units In Exclusive ComplexKolasin, Montenegro, R2110-3


    Key features

    • Under Construction
    • Hotel rooms ranging from 25.53 m2 to 28.53 m2
    • Hotel apartments ranging from 43.62 m2 to 99.97 m2
    • Swimming Pool
    • Wellness Center
    • Panoramic views

    Hotel units within exclusive tourist-residential complex

    About this property

    • A new tourist-residential complex in Kolasin is offering fully furnished condo units that meet the highest standards of aesthetics and sustainability. The units come in two types: hotel rooms from 25.53 m2 to 28.53 m2 and classic or duplex apartments, from 43.62 m2 to 99.97 m2, with a panoramic view of the city, nature, and the surrounding mountain ranges.

      Price list of units according to type and size:

      Hotel room: total area 25.53m2 - price: €107,226

      Hotel room: total area 28.53m2 - price: €119,826

      Hotel apartment: interior space 36.60m2 + terrace 7.02m2 - price: €183,204

      Duplex apartment: total area 44.36m2 - price: €177,440

      Duplex apartment: total area 45.25m2 - price: €181,000

      Duplex apartment: total area 47.09m2 - price: €188,360

      Duplex apartment: total area 48.14m2 - price: €192,560

      Presidential suite with its own Turkish bath - Interior space 88.09m2 + two terraces of 5.94m2 each - price: €399,880

      The complex includes a spa and wellness center, gym, swimming pool, an exclusive restaurant with a unique gastronomic concept in the north of Montenegro, and a hotel bar, all of which will be accessible to future owners. The experienced hotel operator Casa Hospitality Management, which operates the Casa del Mare group, will manage the condo hotel.

      This complex is located just a few minutes walk from the city center and a 10-minute drive from the most extensive ski center in the country

      Construction of the complex, which covers over 12,000 square meters, began in the summer and is expected to be completed in 2024.