The building, currently under construction, will be built to the highest standards required by the logistics market and will be available in the first quarter of 2025. It has a total area of 34,000 sqm, and can be split into two units: approximately 20,000 sqm Unit A and approximately 14,000 sqm Unit B. It features a 12-metre clear height under beams, an NFPA/ESFR sprinkler system, a floor load capacity of 5 tonnes per square metre and 38 loading bays. LEED Gold certified.