Flexible working at the Dantehof
This office and commercial building, completed in 2002, impresses with its sophisticated and design-oriented architecture. The property has a representative entrance area as well as a thoroughly high-quality overall equipment.
The office equipment includes:
-EDP cabling via cavity floor with flexible floor tanks in the office area and continuous raised floor in the corridor area possible and to be provided by the tenant.
-external sun protection, controlled room by room
-ventilation of the office areas with peak cooling
-clear office height of approx. 3.15-3.40 m with floor-to-ceiling windows facing the inner courtyard and Hanauer Strasse
-high-quality equipped kitchenettes
-4 passenger elevators
-access control by code card reader
-harmonious, landscaped inner courtyard with idyllic pond area
An energy performance certificate according to EnEV exists.
Date of issue: 29.09.2020
Date of Expiry: 28.09.2030
Year of construction: 2002
Type of energy performance certificate: Requirement certificate
Significant energy sources: District heating 70% K*
Final energy electricity: 34,00 kWh/(m²*a)
Final energy heat: 169,00 kWh/(m²*a)