Planned construction of two modern industrial halls (20,300 sq m and 17,700 sq m). Premises will be suitable for warehousing, logistics, distribution or light production. Both buildings are planned with higher than standard clear internal height of 12.5 m. Construction will be carried out on a built-to-lease basis and according to tenant's requirements. Handover of the building is possible within 9 months after the signature of a Future Lease Agreement.