Location
The park currently consists of one modern distribution centre totalling 27,400 sq m, which was completed in 2020. The existing building is BREEAM Outstanding certified and is fully occupied by a long-term tenant. Construction of another two buildings is planned (32,500 sq m and 39,500 sq m). Premises will be suitable for warehousing, logistics, distribution or light production. Construction will be carried out on a built-to-lease basis and according to tenant's requirements. Occupation is possible within 6-9 months after Future Lease Agreement signature.