Location
Fancy offices in TRIOTOP...
special features:
- elevator
equipment:
- ceiling: smoothly filled and painted
- lighting: suspended ceiling light
- floor covering: parquet flooring
- cable run: floor tanks/wall cabling
- cable-technics: existent cable system
- sun protection: exterior manually; partially electric operated
- miscellaneous: flexible floor planning, kitchenette (install facilities existing)
An energy performance certificate according to EnEV exists.
Date of issue: 28.09.2015
Date of Expiry: 27.09.2025
Year of construction: 2006
Type of energy performance certificate: Requirement certificate
Significant energy sources: Natural gas E (previously H)*
Final energy electricity: 21,80 kWh/(m²*a)
Final energy heat: 73,20 kWh/(m²*a)