BUILDING UNDER CONSTRUCTION
The building will incorporate the following finishes:
- False ceiling with armstrong tiling.
- Raised technical flooring.
- 24 hours security system.
- TV security circuit.
- Open plan space
- Centralized 4 pipe fancoil Air conditioning system.
- Parking spaces ( interior and exterior)
Floor | Module | Use | Space | Availability |
---|---|---|---|---|
Planta 3ª | Módulo B | Offices | 340,00 | Immediate |
Planta 2ª | Módulo C | Offices | 416,00 | Immediate |