Modern office building in Grasbrunn near Munich
- cable system via raised floor*
- window axial dimension: approx. 1,25 m
- room height: approx. 3,00 m
- room depth: approx. 6,70-7,00 m
- flexible room layout
- suspended metal grid ceilings with integrated, workstation lighting
- cooling ceilings /mechanical intake and exhaust air system
- electrical external sun protection
- lightflooded basement surfaces for flexbile usage
- 4 fright elevators (load capacity 1t)
- 4 elevators
* the available cabling has to be checked.
An energy performance certificate according to EnEV exists.
Date of issue: 25.06.2019
Date of Expiry: 24.06.2029
Year of construction: 2001
Type of energy performance certificate: Requirement certificate
Significant energy sources: Electricity, Natural gas E (previously H)*
Power consumption: 80,00 kWh/(m²*a)
Consumption heat: 73,10 kWh/(m²*a)