Location
A planning consent has been granted for a unit of 78,100 sq ft which is deliverable within 9 months.
Description
A proposed final phase of industrial development at Suffolk Park comprising 12.5 acres with a plot available to accommodate 78,100 sq ft.
The unit will be able to accommodate a range of industrial and logistics occupier and will offer spacious facilities with a secure yard and high quality office space.
SP77 will be constructed to an EPC 'A' rating and BREEAM 'Excellent' status and will benefit from a range of sustainability features including 10% EV parking, low flush volume WC's, PV ready roof, carpets with 84.48% recycled and bio-based content, and solar thermal pre-heated hot water.
Sizewell C
Sizewell C will be a 3.2-gigawatt power station generating low-carbon electricity for around 6 million homes, which will be a close copy to Hinkley Point C.
This is a huge and amazing opportunity for both the country and the region with 70% of the projects construction spend going to UK companies which will help them to embed nuclear skills and expand their workforce.
• 2,600 Suffolk construction jobs
• 70, 000 UK jobs supported
• £4b Into the regional economy
• 6m Homes powered
• 9m Tonnes of CO2 avoided every year of operation’
A (9)