Planned construction of one smaller industrial hall, which has been designed with a clear internal height of 7.5 m. Handover of the premises is possible 12-14 months after signing the contract. The premises will be suitable for light production, R&D or warehousing. The property may be delivered for long-term lease or for sale (into ownership).