Fleetinselkontor
- central location
- roof terrace
- in-house underground garage
- cooling due to concrete core activation
- floor standing lamps
- high-quality facilities
- floor-to-ceiling and openable windows
- good traffic connections
- cavity floor
- access control system using transponder technology
An energy performance certificate according to EnEV exists.
Date of issue: 24.08.2015
Date of Expiry: 23.08.2025
Year of construction: 2015
Type of energy performance certificate: Requirement certificate
Significant energy sources: CHP, fossil
Final energy electricity: 22,00 kWh/(m²*a)
Final energy heat: 42,30 kWh/(m²*a)