Loft-style Office Space in Düsseldorf – Flexible and Well-Connected
- flooring and lighting according to the tenant's requirements
- electric sun protection outside
- air-conditioning can be realised
- Cat-6 cabling via raised floors
- flexible partitioning
- tea kitchens
- loft character
An energy performance certificate according to EnEV exists.
Date of issue: 25.08.2014
Date of Expiry: 24.08.2024
Year of construction: 2013
Type of energy performance certificate: Requirement certificate
Significant energy sources: Electricity
Final energy electricity: 34,00 kWh/(m²*a)
Final energy heat: 24,00 kWh/(m²*a)