Modern spaces at the main train station
The 7-storey office, residential and commercial building was built in 1998.
Two building sections that can be displayed together
Elegant natural stone façade
Prestigious entrance area with natural stone floors
Atrium with skylight dome
Passenger lifts
Flexible room layout
Cavity floor with floor tanks
Suspended ceilings with integrated lighting
High-quality carpeting
KAT-5 cabling available
External sun protection
Partial roof terrace
Fully equipped kitchenettes
Separate sanitary facilities
Car parking spaces
An energy performance certificate according to EnEV exists.
Date of issue: 27.03.2024
Date of Expiry: 27.03.2034
Year of construction: 1998
Type of energy performance certificate: Requirement certificate
Significant energy sources: Local/district heating*
Power consumption: 41,50 kWh/(m²*a)
Consumption heat: 67,80 kWh/(m²*a)