To rent office space at Barbarossaplatz
special features:
- code card system
- intercom
- in-house underground parking
- 4 elevators
Equipment:
- ceiling: partly suspended and not suspended
- lighting: surface mounted luminaires and BAP-compliant lighting
- floor covering: carpet and PVC
- cable run: skirting strips/baseboard
- cable technics: wired Cat-7
- climate control: full air conditioning
- sun protection: externally electric
- miscellaneous: flexible room layout, kitchenette
An energy performance certificate according to EnEV exists.
Date of issue: 22.04.2025
Date of Expiry: 21.04.2035
Year of construction: 1972
Type of energy performance certificate: Requirement certificate
Significant energy sources: District heating, Electricity
Power consumption: 100,00 kWh/(m²*a)
Consumption heat: 68,80 kWh/(m²*a)