Beautiful office space with perfect infrastructure at the Riem Arcaden
The StadtQuartier Riem Arcaden in the trade fair city, completed in 2005, offers representative office space for demanding companies on around 50,000 m².
- EDP cabling via cavity floor with double floor route *
- high quality carpeting
- Anti-glare protection on all sides
- Corridor lighting optionally direct / indirect
- Office lighting optimally flexible thanks to high-quality floor lamps
- Lightweight partitions
- kitchenette (optional)
- room cooling (optional)
- external electrical sun protection
- illuminated facade
- Acoustic sail or acoustic ceiling
* The functionality of the IT network must be checked by the tenant.
An energy performance certificate according to EnEV exists.
Date of issue: Unknown
Date of Expiry: 11.11.2029
Year of construction: 2004
Type of energy performance certificate: Requirement certificate
Significant energy sources: District heating
Energy Performance: 134,40 kWh/(m²*a)