Remise space in Tempelhof
- Former factory building, built in 1905
- modern passenger lifts
- flexible floor plan
- areas with loft character
- high ceilings, generous window areas
- exposed concrete and brickwork
- workplace-oriented lighting
- cavity floor/double floor
- cabling
- kitchenettes
- modern sanitary facilities
- outdoor car parking spaces
An energy performance certificate according to EnEV exists.
Date of issue: 05.05.2021
Date of Expiry: 05.05.2032
Year of construction: 1930
Type of energy performance certificate: Requirement certificate
Significant energy sources: Natural gas E (previously H)*
Final energy electricity: 24,60 kWh/(m²*a)
Final energy heat: 138,70 kWh/(m²*a)