Buildings 1, 2 & 3 Bluebell Industrial Estate, Buildings 1, 2 & 3 Bluebell Industrial Estate | Property for sale | Savills
2,227 sq ft(206.89 sq m)
Price on application

Buildings 1, 2 & 3 Bluebell Industrial EstateBuildings 1, 2 & 3 Bluebell Industrial Estate

  • Reserved
  • Sole agency

Key features

  • Clear internal height from approx. 4.9 – 5.5 meters
  • 5 no. automated ground level roller shutter doors
  • Zoned under objective ‘EE’ in the SDCC Development Plan 2016 – 2022.
  • Located in an area designated for the City Edge Development Project

Three industrial units totaling approx. 2,227 sq. m. (23,971 sq. ft.) on approx. 0.44 ha (1.1 acres)

About this property

  • Warehouse: Concrete frame construction. Painted concrete floors with full height concrete block walls High bay sodium lighting Total of 5 no. automated ground level roller shutter doors Clear internal height from approx. 4.9 – 5.5 metres Asbestos roofs to two units with metal deck roof to third unit Offices: Painted and plastered walls and ceilings with fluorescent strip lighting Electric storage heating Mixture of carpeted & painted concrete floors Double glazed windows Wall mounted sockets Toilets

Local information

  • Bluebell Industrial Estate is just off the Kylemore Road and lies adjacent to the Naas Road, approx. 3.5kms from Junction 9 on the M50 (Red Cow interchange), which provides rapid motorway access to Dublin Port, Dublin Airport and all of the main arterial routes from Dublin. The properties are located approx. 6.5 kms southwest of Dublin city centre and approx. 21 kms southwest of Dublin Airport.

Additional information

  • The subject properties are in an area zoned under Objective ‘EE’ in the South Dublin County Council Development Plan 2016 – 2022, i.e. “To provide for enterprise and employment related uses.” The property is also located in an area designated for the City Edge Development Project.
  • The subject properties are in an area zoned under Objective ‘REGEN’ in the South Dublin County Council Draft Development Plan 2022 – 2028, i.e. “To facilitate enterprise and/or residential-led regeneration subject to a development framework or plan for the area incorporating phasing and infrastructure delivery’’.

Available space

Building Sq M
Building 11724
Building 2258
Building 3245