Turnkey project for two logistics warehouses with excellent image and perfect finishes. The project can be adapted to the needs of the tenant.
- Concrete structure.
- Sandwich roof.
- 34 loading bays in Warehouse I.
- 34 loading bays in Building II.
- 1 TIR door per building.
- Fully equipped offices: offices, changing rooms, lifts, meeting room and toilets.
- Warehouse prepared for medium risk 5.
- Possibility of adapting the project to SEVESO regulations.
- 239 parking spaces.
| Floor | Module | Use | Space | Height | Availability |
|---|---|---|---|---|---|
| Nave I | Warehouse | 27.024,00 | 12.0 | Immediate | |
| Nave I | Offices | 2.520,00 | 3.0 | Immediate | |
| Nave I aux. | Industrial | 131,00 | 3.0 | Immediate | |
| Nave II | Warehouse | 26.381,00 | 12.0 | Immediate | |
| Nave II | Offices | 2.520,00 | 3.0 | Immediate | |
| Nave II aux. | Industrial | 131,00 | 3.0 | Immediate |