Logistics warehouses (in project) with excellent image and perfect finishes. The project can be adapted to the tenant's needs.
- Concrete structure.
- Sandwich roof.
- Warehouse I: 62 loading docks and 235 parking spaces.
- Warehouse I: 23 loading docks and 109 parking spaces.
- Building I: 50 loading docks and 85 parking spaces.
- 1 TIR door per warehouse.
- Fully equipped offices: offices, changing rooms, lifts, meeting room and toilets.
- Warehouses prepared for medium risk 5.
| Floor | Module | Use | Space | Height | Availability |
|---|---|---|---|---|---|
| Nave I | Warehouse | 50.349,00 | 11.0 | Immediate | |
| Nave I | Offices | 1.800,00 | 3.0 | Immediate | |
| Nave I alt. | Offices | 2.226,00 | 3.0 | Immediate | |
| Nave I aux. | Industrial | 285,00 | 3.0 | Immediate | |
| Nave II | Warehouse | 19.859,00 | 11.0 | Immediate | |
| Nave II | Offices | 1.128,00 | 3.0 | Immediate | |
| Nave II alt. | Offices | 849,00 | 3.0 | Immediate | |
| Nave II aux. | Industrial | 168,00 | 3.0 | Immediate | |
| Nave III | Warehouse | 39.016,00 | 11.0 | Immediate | |
| Nave III | Offices | 1.440,00 | 3.0 | Immediate | |
| Nave III alt. | Offices | 1.583,00 | 3.0 | Immediate | |
| Nave III aux. | Industrial | 168,00 | 3.0 | Immediate |