New logistics project covering a total land area of 181,453m², where four logistics warehouses will be developed in three staggered phases, highlighting flexibility in construction as one of the key aspects of the project. Possibility of modules from 5,000 sqm. to more than 42,000 sqm.
- Logistics park with flexibility of modular and independent warehouses covering areas from 5,000 sqm. to 42,000 sqm.
- Enclosed logistics park with access control.
- Maximum height under roof plate is 13.7m.
- Fire protection with facilities that allow for activities classified as High Risk 8 in accordance with RD 164/2025 (RSCIEI).
- 50kN/m² overburden floor slab.
- Minimum 35m maneuvering yards.
- A total of 90 loading bays between the three phases (5 / 41 / 44).
- Parking spaces for light vehicles 563
- Photovoltaic installation.
- Natural lighting maximized both in warehouse and offices.
- 300 lux illumination of the warehouse in the dock area.
- Offices with raised floor.
- BMS system.
- BREEAM Excellent.
| Floor | Module | Use | Space | Height | Availability |
|---|---|---|---|---|---|
| Fase III | Warehouse | 42.389,00 | 11.5 | Immediate | |
| Fase III | Offices | 1.821,00 | 3.0 | Immediate |