Prime Grade A office development in the heart of Glasgow's CBD
Description
Cadworks will provide 94,431 sq ft of prime Grade A office space once completed in Q3 2021. The building has been designed with the environment at the forefront with BREEAM Excellent and an EPC of A targeted to produce one of Scotland'd most environmentally friendly office developments. Cadworks will feature Scotland's first 'cycle-in' ramp allowing cyclists the ability to cycle straight into the basement where they will find 119 cycle stations, top class shower facilities with lockers and a body drier.
The full Grade A floorplates will be offered in 'shell and floor' condition with occupiers having the ability to selected different ceiling finished including, rafts, exposed or a traditional suspended ceiling.
Specifications
- Designed to achieve BREEAM 'Excellent'
- A fully manned feature reception.
- Virtually column free floor plates.
- Full Grade A specification.
- Raised access floors.
- Suspended ceilings with metal ceiling tiles.
- 119 Bike stations with cycle-in ramp
- 4 Electric Car Charging points
EPC Rating is A
Floor / Unit | Type | Size | Status |
---|---|---|---|
Ground | Office | 3552 sq ft | Coming Soon |
1st | Office | 9978 sq ft | Coming Soon |
2nd | Office | 10139 sq ft | Coming Soon |
3rd | Office | 10139 sq ft | Coming Soon |
4th | Office | 10140 sq ft | Coming Soon |
5th | Office | 10139 sq ft | Coming Soon |
6th | Office | 10086 sq ft | Coming Soon |
7th | Office | 10086 sq ft | Coming Soon |
8th | Office | 10086 sq ft | Coming Soon |
9th | Office | 10086 sq ft | Coming Soon |