The building has a total GLA of 29,695 sqm divided into two units of 12,605 sqm and 17,090 sqm respectively, and is undergoing a major redevelopment scheduled for completion in april 2026. Unit A is still available. It has a total SLP of 12,604 sqm: 12,348 sqm of warehouse and 256 sqm of offices. The project aims to achieve BREEAM Very Good certification, ensuring high standards of sustainability and operational efficiency. Key technical features of Unit A include internal height of 11 metres under beam; 15 loading bays distributed over two frontages to optimise logistics operations; NFPA/ESFR sprinkler system; flooring with a capacity of 5 tonnes per square metre.