The new development involves the construction of several logistics buildings, including: - Building B3: total area of approx. 5,500 sqm, comprising 5,100 sqm of warehouse space and 400 sqm of offices arranged over two floors. The building will feature a clear height of 12 metres, a sprinkler fire protection system, 5 loading bays, a floor load capacity of 5 t/sqm, a 32-metre-deep truck yard, LED lighting, REI 120 fire resistance rating, and a rooftop photovoltaic system. It will be available within 10 months from the signing of a binding agreement. - Building D1: total area of approx. 8,100 sqm and will be constructed only upon execution of the relevant binding preliminary agreement. The buildings are developed in line with the standards required by the logistics market, with the aim of achieving LEED Gold Certification.