The existing last-mile logistics asset offers a total GLA of 4,527 sqm, comprising 3,175 sqm of warehouse space and 1,352 sqm of offices and ancillary areas. The operational areas are distributed across the basement and ground floors, while the offices and ancillary facilities occupy the basement, ground and first floors, providing functional and highly adaptable spaces to accommodate a wide range of operational requirements. The ground-floor warehouse features a clear internal height of 9 metres. The building has been designed for industrial use and is suitable for forklift and pallet truck operations as well as heavy-duty racking systems. The basement features a slab-on-grade floor with no nominal load limitation, while the office areas are predominantly configured as open-plan spaces. The building has been designed to deliver high logistics efficiency: It features 15 loading bays positioned at the sectional doors, five of which are already fitted with dock levellers. The external yard extends over more than 4,000 sqm, providing ample manoeuvring space and allowing one articulated truck to be positioned at each loading bay, in addition to approx. 8 extra parking spaces for articulated trucks. The site also includes 10 on-site car parking spaces, complemented by additional public parking available along the adjacent municipal road. The two operational levels are connected by both staircases and a freight lift, facilitating the vertical movement of goods. The warehouse also includes a refrigerated area equipped with recently installed cold storage rooms, making the property particularly suitable for food, pharmaceutical and frozen goods logistics. The asset underwent a major refurbishment programme between 2020 and 2023, aimed at completely upgrading the internal layout. The works included the refurbishment of the cold storage rooms, upgrades to the building services and MEP systems, and the construction of new external fire escape staircases, bringing the asset up to modern logistics standards. The asset is currently occupied and will become available from May 1, 2027.