4,120 m² spread over 7 floors. Facing the municipal park, three former administrative buildings have been redeveloped into a single structure. To create a sense of unity, the main façade is treated as a cohesive whole, while still allowing the original three buildings to be discerned-preserving the site’s historical narrative. At the rear, the building opens onto a garden. The extension is designed with varying levels and depths, creating private terraces. "The Henri" connects the structure to the surrounding green spaces, fostering a focus on workplace well-being; the expansive glass façades reinforce these connections and ensure optimal natural light. Fully fitted-out space, available from March 2027.
| Build. | Floor | Type | From | To |
|---|---|---|---|---|
| 6th | OFFICES | 340 s qm | 340 s qm | |
| 2nd | OFFICES | 281 s qm | 701 s qm | |
| Ground | OFFICES | 265 s qm | 564 s qm |