Vilamoura | Property for sale | Savills
1,236.77 sq ft(114.90 sq m)
Guide price €950,000(£809,688)

Vilamoura


    Key features

    • South-west orientation for good natural light
    • 2 en-suite bathrooms
    • 2 underground parking spaces
    • Private storage room
    • Luxurious finishes
    • Underfloor heating and home automation
    • Electric shutters and blackouts
    • Gated community with 8,250m² of landscaped areas
    • 25-metre heated salt-treated swimming pool
    • Dedicated children’s pool
    • Outdoor fitness circuit
    • Eco-friendly design with solar power and rainwater harvesting

    This first-floor 2-bedroom apartment benefits from two ensuite bathrooms and a south-west aspect that provides good natural light throughout the day. The layout offers practical living space with well-proportioned rooms and luxurious finishes.The property includes two underground parking spaces and a private storage room. Residents have access to 8,250m² of landscaped communal areas, a 25-metre heated salt-treated swimming pool, a children’s pool, an outdoor fitness circuit and a poolside function room.Oak35 is a secure, low-density gated community in a quiet residential area of Vilamoura. Local amenities, golf courses, the marina and Falésia beach are all within minutes.Completion is scheduled for mid-2026.

    About this property

    • This first-floor 2-bedroom apartment benefits from two ensuite bathrooms and a south-west aspect that provides good natural light throughout the day. The layout offers practical living space with well-proportioned rooms and luxurious finishes.The property includes two underground parking spaces and a private storage room. Residents have access to 8,250m² of landscaped communal areas, a 25-metre heated salt-treated swimming pool, a children’s pool, an outdoor fitness circuit and a poolside function room.Oak35 is a secure, low-density gated community in a quiet residential area of Vilamoura. Local amenities, golf courses, the marina and Falésia beach are all within minutes.Completion is scheduled for mid-2026.