Modern production hall totalling 9,500 sq m, that was built in 2008 for a specific tenant and since then has been fully occupied. The building was built with a clear height of 8.5 m, several drive-in gates and loading docks.
Local information
The building is located in the southern part of Vyškov, 2 km from exit 226 of the D1 highway (Prague - Brno - Ostrava). The nearest bus stop is 550 m walk away.