Location
Planned construction of two industrial halls of 53,600 sq m and 35,100 sq m. Both buildings have been designed with higher than standard clear internal height of 12 m. Premises will be suitable for warehousing, logistics, distribution or light production. Construction will be carried out on a built-to-lease basis and according to tenant's requirements. Handover of the building is possible within 6 months after the signature of a Future Lease Agreement.