The planned construction of an industrial complex in the brownfield area. The campus will consist of 5 buildings occupying a total area of 127,963 m2. In the area, it is possible to ensure a power input of 100 MW and to extend the railway siding. Buildings can also be built for ownership. The possibility of expanding the area by 4 ha.