Malveira Prime Logistics 68.141 m²
Mafra, Lisboa
- Inserted in a residential areaInserted in a residential area
- Close to public transportationClose to public transportation
- 30 minutes from Lisbon30 minutes from Lisbon
- Construction scheduled to begin in Q2 2024Construction scheduled to begin in Q2 2024